What's the latest with the Owens Valley Sub? Here you will find it.

This page is set up as a History page, with the very first dated entry at the bottom, and the newest entry at the top. There is also a little comment about what you will find when viewing that entry's page. So check it out!

 

January 7th, 2010 More scenery in Walker River Canyon
November 29th, 2009 Visit from Frank Kenny, SCENERY started in W.R.C. Turnout installed at North Mammoth
October 18th, 2009 Started installing Grade Crossing Pro
September 16th, 2009 Visit from Mark Lestico, rebuilt subroadbed from Owens Valley Gorge to Helix
August 15th, 2009 Put in more upper level staging tracks
August 2nd, 2009 Installed control panel for L.L. staging, installed turnouts and tortoises for U.L. staging
July 27th, 2009 Painted and installed 2 pieces of fascia, wired last upper level block detector, hung pictures
July 20th, 2009 Kitbashed East Walker River trestle, added elevation supports to W.C. cut out u.l.FASCIA!
July 12th, 2009 Finished north Sonora turnout, added air purifier and door, rebuilt Walker Canyon roadbed
June 27th, 2009 Completed curve turnout at Bridgeport, finished Sonora siding track and wiring
June 12th, 2009 Wired main between JL and Sonora. Added 12 and 6V power. Installed toggles
June 5th, 2009 VIDEO of train running around the upper level.
May 13th, 2009 Pretty much nothing, just a .gif of the layout room
April 30th, 2009 Added some temporary scenery and made a VIDEO
April 7th, 2009 Wired June Lake main. Changed feeder wire soldering technique
March 29th, 2009 Completed June Lake siding, Helper Pocket, and glued down most upper level roadbed
March 19th, 2009 Completed a #10 turnout at Bridgeport, REDID Train room Lights
February 17th, 2009 Completed subroadbed for upper level, laid track in Walker Canyon, started gluing roadbed
February 1st, 2009 Installed final lower level lights, finished painting backdrops, more subroadbed for upper level
January 18th, 2009 Rebuilt the drop down access bridge
January 12th, 2009 More backdrop painting, PVC added to peninsula ends, finished filling and sanding backdrops
December 21st, 2008 Painted a little bit more backdrop, finished wiring the lower level staging yard
November 28th, 2008 Painted some more backdrops, redid lower level staging yard throat, lots of wiring
November 4th, 2008 Changed backdrop colors, painted more backdrops
October 30th, 2008 Started painting some backdrops
October 1st, 2008 Installed cinder plant turnout, finished main line trackage to north end of June Lake siding
September 10th, 2008 Glued down June Lake passing siding, installed helper turnout, redid top helix roadbed
August 20th, 2008 2 pages! finished south June Lake turnout, glued down homasote and track for siding
July 21st, 2008 Cut out homasote for upper level and glued down turnout ties
July 5th, 2008 Finished subroadbed for Mammoth, installed track on helix, ran train to upper level
June 22nd, 2008 2 pages! Installed some block detectors, installed subroadbed for half of upper level
June 4th, 2008 2 pages! installed lower level lights, temp. facia/control pannel, laid track on branchline
April 23rd, 2008 Finished turnouts on drop bridge, fixed superelevation, finished a/d tracks
April 3rd, 2008 finished more staging tracks, wiring, and started handlaying turnouts on drop bridge
February 21st, 2008 started on lower level staging throat and tracks
February 10th, 2008 completed track from lower level staging to visable layout
January 24th, 2008 benchwork for staging tracks in laundry room
December 16th, 2007 handlaid more yard throat, switched cars in yard
November 28th, 2007 started on subroadbed and grade for main line out of switching area
November 11th, 2007 finished the backdrops, ran new lightswitch wire
October 28th, 2007 more work on the backdrops
October 21st, 2007 2 pages! South yard templates in, branch line subroadbed in, mockup of South Bishop
October 14th, 2007 finished benchwork and added homasote to south yard
August 12th, 2007 finished yard lead and engine service trackage
July 29th, 2007 changed yard design, more turnouts laid
July 15th, 2007 2 pages! first turnout HANDLAID! started yard trackage
July 5th, 2007 completed the HELIX!
June 30th,, 2007 installed first pieces of homasote and first piece of TRACK!
June 24th, 2007 completed upper level benchwork above entrance, added dropdown entrance bridge
June 20th, 2007 cut hole in wall for lower level, added subroadbed, upper level supports
June 17th, 2007 started on the HELIX!
June 10th, 2007 2 pages! some backdrops installed, new "wall" put in, more benchwork
June 3rd, 2007 more supports along the laundry room wall and lowered benchwork
May 27th, 2007 more supports along rear wall and cut out owens river in peninsula
May 17th, 2007 finished the upper level supports on the peninsula
May 10th, 2007 added subroadbed to rest of yard and peninsula
May 3rd, 2007 added sub roadbed to yard, supports for peninsula
April 23rd, 2007 marked outline of benchwork on floor and put up FIRST SUPPORT!!
April 12th, 2007 install flooring and paint ceiling blue
March 16th, 2007 room demolition and preparation

 

 

All material on The Owens Valley Subdivision website is Copyright 2007-2010 by Michael Stoner. None of the material (including text and photographs) on this web site may be reproduced in any form without prior written permission.